FOI Request - Road Bridges

Request 101002933685

Defining a “road bridge” as a structure with a span of 1.5m or more providing public highway passage for motor vehicles over an obstacle such as a watercourse, railway, road or valley, please provide the following information for all road bridges for which you own as highway authority, including those which are jointly owned with another authority, but for which you are the lead authority:

1. How many road bridges are you responsible for maintaining?
2. For the last financial year (2020/21) how many Principal Inspections have taken place as a % of those requiring an inspection?
3. For the last financial year (2020/21) how many General Inspections have taken place as a % of those requiring an inspection?
4. For the last financial year (2020/21) how many Structural Reviews and/or BD21 assessments have been conducted as a % of those requiring an inspection?
5. How many sub-standard (in terms of capacity) and/or weight restricted bridges do you have?
6. Of these, how many do you intend to return to full load carrying capacity in the next 5 years?
7. How many bridges would you return to full load carrying capacity if you had no resource restrictions?
8. (i) How many of your bridges require post tensioned special inspections (PTSIs)?
(ii) How many of those have had PTSIs within the last 18 years?
(iii) Of those that have not had a PTSI, how many require/are due one?
(iv) How much funding would you anticipate is required to remove the backlog of PTSIs for those bridges identified in Q8(iii)?
9. In monetary terms, what is the current Depreciation (i.e. difference between your GRC and DRC as declared for your WGA return for 2020/21)?  
10. What is the calculated value of your backlog of work for road bridges, or your best estimate if a calculated value is not available?
11. (i) What is the annual revenue works budget for maintaining your bridge stock? (excluding staff costs)
(ii)  What is the annual capital works budget for maintaining your bridge stock?
(iii) What total budget would you estimate is required to maintain the bridge stock at its current level (standstill budget)?
12. (i) How many BD97 Stage 1 Scour Assessments did you undertake in 2020/21as a % of those requiring an assessment?
(ii) How many BD97 Stage 2 Scour Assessments did you undertake in 2020/21as a % of those requiring an assessment?
13. (i) How many bridges under your management completely collapsed in the last 12 months?
(ii) How many bridges under your management partially collapsed in the last 12 months?
(iii) Would you be happy to share the detail with members of the UK Bridges Board? Y/N

Response 17-12-21

1.            How many road bridges are you responsible for maintaining?
                               376
2.            For the last financial year (2020/21) how many Principal Inspections have taken place as a % of those requiring an inspection?
                              42%
3.            For the last financial year (2020/21) how many General Inspections have taken place as a % of those requiring an inspection?
                              100%
4.            For the last financial year (2020/21) how many Structural Reviews and/or BD21 assessments have been conducted as a % of those requiring an inspection?
                              42%
5.            How many sub-standard (in terms of capacity) and/or weight restricted bridges do you have?
                               10 Weight Restricted Bridges
6.            Of these, how many do you intend to return to full load carrying capacity in the next 5 years?
                               1 Bridge
7.            How many bridges would you return to full load carrying capacity if you had no resource restrictions?
                              8 Bridges  
8.            (i) How many of your bridges require post tensioned special inspections (PTSIs)? nil
(ii) How many of those have had PTSIs within the last 18 years? N/A
(iii) Of those that have not had a PTSI, how many require/are due one? N/A
(iv) How much funding would you anticipate is required to remove the backlog of PTSIs for those bridges identified in Q8(iii)? N/A
9.            In monetary terms, what is the current Depreciation (i.e. difference between your GRC and DRC as declared for your WGA return for 2020/21)?  £4,700,000
10.          What is the calculated value of your backlog of work for road bridges, or your best estimate if a calculated value is not available? No Calculation or estimate has been made. This information therefore falls under Section 17 of the Freedom of Information (Scotland) Act 2002 - information not held. 
11.          (i) What is the annual revenue works budget for maintaining your bridge stock? (excluding staff costs) £105,000
(ii)  What is the annual capital works budget for maintaining your bridge stock? Varies year to year, depending on requirements.
(iii) What total budget would you estimate is required to maintain the bridge stock at its current level (standstill budget)? No Calculation or estimate has been made. This information therefore falls under Section 17 of the Freedom of Information (Scotland) Act 2002 - information not held. 
12.          (i) How many BD97 Stage 1 Scour Assessments did you undertake in 2020/21as a % of those requiring an assessment? nil
(ii) How many BD97 Stage 2 Scour Assessments did you undertake in 2020/21as a % of those requiring an assessment? nil
13.          (i) How many bridges under your management completely collapsed in the last 12 months? nil
(ii) How many bridges under your management partially collapsed in the last 12 months? 2 Bridges
(iii) Would you be happy to share the detail with members of the UK Bridges Board? Y/N Yes